Met-Ocean Data Projects
|
Design water levels and waves from Mina Jebel Ali to Dry
Docks, Dubai.
Client: Dubai Municipality, U.A.E. 2005
|
|
Iranian Seas Wave Hindcast Study. Iran
Client: Ports & Shipping Organisation, Iran (in cooperation
with INCO) 2003-04
|
|
Metocean Design Data Soroosh & Nowrooz.
Client: Shell International, NL. 2000
|
Beach Design and Shoreline Management Projects
|
Dubai Coast Management Guidelines, Dubai, U.A.E.
Management guidelines for shoreline development and protection under
the impact of the new mega offshore developments. Shoreline evolution
prediction and development of mitigation measures and schemes.
Client: Dubai Municipality, U.A.E. - 2005-06
|
|
‘OQYANA – World First’, Dubai, U.A.E. Master
plan for resort on the World Islands archipelago; wave studies, beach
design and water quality modelling.
Client: OQYANA Dubai LLC, Dubai, U.A.E. 2006
|
|
Integrated Coastal Zone Management, Iran.
Establishment of an integrated Coastal Zone Management Plan for the
entire Iranian coastline covering the Caspian Sea, the Persian Gulf
and the Oman Sea.
Client: Port & Shipping Organisation, Iran. 2003-05
|
Waterfront Development Projects
|
La Ville Contemporaine, Dubai. U.A.E. Flushing and
water quality study for Dubai Creek, the Lagoons and The Creek
Extension (BusinessBay) for EIA.
Client: Sama Dubai and Dubai Properties, Dubai, U.A.E.,
2005-06
|
|
Saadiyat Island Project - Marina and Dredging, Abu Dhabi,
UAE. Flushing and sedimentation in connection with dredging
for new development scheme. Beach development studies and design
Client: High-Point Rendel, UK on behalf of TDIC, Abu Dhabi,
U.A.E - 2005-06
|
|
The World Islands, Dubai, UAE. Flushing, water
quality and wave penetration studies for design optimisation of
perimeter breakwater structure.
Client: Nakheel, Dubai, U.A.E. 2005-06
|
|
North Beach Master Plan Development, Qatar.
Consultancy on hydraulic and coastal engineering aspects.
Client: COWI, Qatar 2004-05
|
|
|
|
|
|
Ports & Harbour Projects
|
Ras Laffan Port Expansion, Qatar . Wave
transformation and agitation modelling studies and 2D and 3D
breakwater model tests.
Client: Sogreah Consultants, France, on behalf of Jan de Nul
& Royal Boskalis Westminster JV - 2005-06
|
|
Salalah Port, Oman. Studies to support development
of future ports expansions; wave measurements, wave conditions study,
wave disturbance and downtime for operations.
Client: Salalah Port LLC, Oman - 2005-06
|
|
Ras Laffan Port Master Plan, Qatar. For the 20 years
Master Plan DHI was responsible for establishment of design criteria
and analysis of alternative and phased schemes with regard to wave
agitation, navigation conditions and siltation.
Client: Beckett Rankine Partnership, UK on behalf of Qatar
Petroleum - 2004-05
|
|
Sohar, Seeb, Barka, and Suwaiq Fishing Harbours,
Oman . Hydraulic investigations for the planning and
layout optimisation of four new fishing harbours.
Client: CES LLC, Oman, on behalf of Ministry for Agriculture
and Fishery, Oman
|
Causeways, Dredging and Reclamations
|
Qatar – Bahrain Causeway. Hydraulic and marine
environmental impact studies.
Client: COWI, Denmark - Ministry of Municipality and
Agriculture Affairs, Qatar – 2001
|
|
GPIC Marine Works, Bahrain . Hydraulic model study.
Investigation of effect of new marine terminal on siltation and
navigation.
Client: COWI-Almoayed Gulf, Bahrain. 1995
|
|
Saudi Arabia-Bahrain Causeway Study. Scour
Protection Study. Assessment of scour, design of scour
protection
Client: Ministry of Finance and National Economy, Saudi
Arabia
|
|
|
|
Power Desalination Projects
|
Q-Chem II Mesaieed Industrial City, Qatar.
Bathymetric and hydrographic survey and 3D numerical modelling of
cooling water dispersion and recirculation potential
Client: Daewoo Engineering & Construction Co. Ltd, Korea –
2006
|
|
Qurayyah Power Plant Expansion, Saudi Arabia.
Optimisation of cooling water intake and discharge location by
modelling and prediction of cooling water recirculation risk
Client: Saudi Electricity Company, Saudi Arabia – 2006
|
|
Shoaiba Independent Water & Power Project, Saudi
Arabia . Marine baseline survey for marine impact study of
Phase III plant expansion. 3D circulation modelling to optimise
location of intake and outfall.
Client: Fichtner, Germany, on behalf of Western Electricity
Company, Saudi Arabia – 2003-04
|
|
Shoaiba Power Plant, Stage 1, Phase 1, Saudi Arabia.
Hydraulic model investigations for design of discharge channel and
jetty.
Client: Saudi Archirodon Ltd, Jeddah
|
|
|
|
Offshore Installations, Pipeline & Outfalls Projects
|
Manifa Field Development, Saudi Arabia . EIA
including flushing and sedimentation study.
Client: King Fahd University, on behalf of Saudi Aramco –
2006
|
|
Manifa Field Development, Saudi Arabia. Marine
design conditions for Causeway and Islands.
Client: Jacobs Gibb, UK on behalf of Saudi Aramco – 2006
|
|
Pipeline Design Guidelines & Software. U.A.E.
Client: Abu Dhabi Marine Operating Company. 2001
|
|
Pipeline Stability Calculation. U.A.E.
Client: SCAN Int’l, Abu Dhabi, U.A.E. 2001
|